Installation of a steel pipe Ø411 using T240 Hammer.
The installation was made under the existing roadway, on the 3 metres of depth in the Żywiec National Park. This is an exceptionally difficult terrain, fully of rocks, Stones and loams.
![ilustracja](http://terma-max.com/upload_images/IMG57A5.tmp.jpg)
![ilustracja](http://terma-max.com/upload_images/IMGA9E7.tmp.jpg)
The Sales Manager from TERMA went to the construction site to train new machine operators.
![ilustracja](http://terma-max.com/upload_images/IMGE023.tmp.jpg)
A Start Pit was made. Then the pipe was oriented and connected with MAX T240 hammer.
![ilustracja](http://terma-max.com/upload_images/IMG540B.tmp.jpg)
![ilustracja](http://terma-max.com/upload_images/IMGB31C.tmp.jpg)
A compressor with a capacity of 9.4 m3/min was used as a power supply for T240 hammer. MAX T240 need maximum 7,5 m3/min.
It was a difficult installation. The ground was full of rocks and sones. The machine MAX T240 has dealt with the installation within about 5 hours.
Length of installation: 12 meters Diameter of steel pipe: 406 mm Depth of installation: 3 meters Time: about 5 hours